7.5 Test Window
The Test window is accessed using the Test button on the main screen. It shows the status of
various i50 inputs, and allows control over outputs. Figure 7 shows the Test window.
Figure 7 Test Window
The Serial Ports frame contains checkboxes that activate the i50 and PC serial control outputs. If the
programmer is connected to i50 COM1 or COM2, labels will be shown to indicate the status of serial
inputs. These states should change when the corresponding outputs are toggled, assuming a full-
handshaking cable is being used.
The Outputs frame allows the i50 digital outputs and VOUT line to be turned on and off for testing
purposes. Note: any changes made to output pins will be discarded when the unit restarts.
Checkboxes are also provided for controlling internal circuits. These control the GPS receiver, 4V
power supply (GPRS and Wi-Fi modems), 9601 Iridium modem, LEDs, and GPRS specific circuits.
Finally, the Test Sleep Current button turns off all outputs and puts the microprocessor into sleep
mode, allowing measurement of sleep mode current draw. Note: the unit must be rebooted manually
to exit this test.